01 / 04
Your inventory arrives
The vehicle backs into the dock. Goods are received, verified against the order and registered into the warehouse.
Our mission
Helping our clients in the industrial and e-commerce sectors strengthen their logistics operations.
Our parks provide strategic advantages designed to support the growth of your business.
We store, configure, ship and transport your goods. Integrated third-party logistics from 500 m² in San Luis Potosí and Querétaro, in central Mexico.
Space for lease from 3,000 m² in Class AAA industrial facilities, so you can run an independent operation with the full infrastructure of the park behind it.
Rent storage by pallet position, by month or fraction of a month. You pay only for what you actually occupy — built for operations with seasonal peaks and valleys.
Organize and sort merchandise bound for different markets across Mexico without storing it. In-house Chronos cross-docking platform inside our logistics parks.
Additional services supporting your logistics operation — labeling, special loading and unloading, packaging, palletizing and fulfillment inside our parks.
We operate a dedicated WMS to manage integrated logistics services in our warehouse, where you control your inventory according to the operations you run.
01 / 04
The vehicle backs into the dock. Goods are received, verified against the order and registered into the warehouse.
02 / 04
Every product gets a rack location and is registered in the WMS, which lets you control your inventory according to the operations you run.
03 / 04
Items are picked, verified and prepared to whatever your operation requires: labeling, packing, palletizing or order-by-order fulfillment.
04 / 04
Freight is consolidated and dispatched. The integrated service does not stop at the dock: it includes moving the goods.
Two locations with distinct roles and the same operating infrastructure.
Hau Can Park is designed to provide the conditions that let you coordinate your logistics quickly and securely.
Cross-docking removes the intermediate put-away and with it days of cycle time. The conditions your operation must meet for it to work, and why it is not always the answer.
Rent per m² is less than half of what you will pay. The eight components of total occupancy cost and how to compare two quotes without surprises.
Buen Fin is won in September, not November. A four-stage preparation calendar so the peak breaks neither your operation nor your margin.